AI-Ready Infrastructure & Modern Data Center Integration

Know the GPU, power and rack numbers you need - before buying the first machine

AI infrastructure illustration: a data center corridor with glowing GPU server racks and a floating network topology
Sound familiar?

Buying GPUs is easier than answering "how many do we need?"

3-10 kW

Power a single GPU server rack draws - double an ordinary rack. Existing cooling usually cannot keep up once you add a set.

1-2 GPUs

Where most pilots can start - but this cannot be guessed; it must be calculated from the model and real user count.

4-12 weeks

Typical installation from approval - electrical or new-room work sits at the far end of this range.

Half - 2 racks

Space to reserve depending on workload, together with floor loading and cooling that come with it.

We start not from the machine but from the question "how heavy is your work?" - every other number follows from it

Infrastructure Services

What we build - and what you get back

On-Premise GPU Cluster & AI Compute

Compute clusters designed from your real models and user counts, enterprise-grade hardware, with power and cooling calculated for every option so you compare before deciding.

  • 2-3 safe spec options with 3-year cost comparison
  • Rack and network cabling layout
  • Installation, benchmark testing and delivery with a runbook

Modern Data Center & High-Density Cooling

Assess and upgrade server rooms for high-power GPU racks - covering PDU power, UPS, cooling and building structural load.

  • Measured room report: power, heat, weight, with headroom
  • Step-by-step upgrade plan within your budget
  • Acceptance with standard documents for the facilities team

Hybrid Cloud & High-Performance Network

Connect on-premise to AWS/Azure/GCP with links sized for real big-data volumes - not just "fast internet" - with a fallback plan when the primary link fails.

  • Network topology with the bandwidth you actually need
  • Connection and throughput testing per plan
  • Failover plan and remediation steps for link incidents
How It Works

From your workload to real racks - step by step

Every project follows the same process: nothing is guessed

The path from workload to real racks Assess Deliver 1 Real workload Models, users, timeframe 2 Calculate specs GPU / VRAM / CPU counts 3 Survey the room Power, heat, rack weight 4 2 real quotes On-prem vs cloud, 3 years 5 Staged install plan Power - network - testing 6 Delivery + runbook Your IT team trained Every number comes from measurement and calculation - not off-the-shelf packages Getting the spec stage wrong means overpaying on both purchase and monthly power
Sizing Example

How to think about it: from one workload to the racks you pay for

Three common cases - figures are example ranges to demonstrate the method; your real numbers come from the site survey

WorkloadGPUs neededPower per rackHeat to removeRack space
Internal RAG pilot (10-20 users)1-2 at 24GB VRAM classAbout 2-4 kWExisting AC can extendHalf a rack
Org-wide inference (100-300 users)2-4 at 80GB+ classAbout 6-12 kWAirflow replan required1-2 racks
Continuous fine-tune / training4-8+ plus high-speed fabricAbout 15-30 kWConsider special cooling2+ racks + extra space

The common miss: the most expensive number is not the GPU - it is power and cooling over the system’s lifetime. Both are fixed at design time and cannot be retrofitted.

FAQ

What decision-makers ask before approving budget

What budget does a GPU server start at?
A pilot (1-2 GPUs in an existing rack) starts in the low hundreds of thousands of baht; real training work runs into millions. The cheapest path is a free site survey first - real numbers from your room and workload, no guessing.
On-premise or cloud?
The rule: long-running usage or data that must not leave the organization usually favors on-premise; short-term or experimental work starts on cloud. We design both and show a 3-year cost comparison in hard numbers before you decide.
Can our existing server room take more GPUs?
Four things must be measured: rack power (one GPU server draws double an ordinary one), cooling, floor loading and free rack space - the site survey answers all four in one report, with the most cost-effective upgrades first.
How long is installation, and who maintains it after?
Adding GPUs to an existing rack: 4-6 weeks; electrical or new-room work: 8-12 weeks from approval. Delivery includes a runbook, system diagrams and training for your IT team - then choose self-managed or our SLA.

Before committing budget, let us measure the real room

Engineer site survey, free and without obligation - a report on power, heat and the specs you truly need. Reply within 1 business day.