AI-Ready Infrastructure & Modern Data Center Integration
Know the GPU, power and rack numbers you need - before buying the first machine
Buying GPUs is easier than answering "how many do we need?"
Power a single GPU server rack draws - double an ordinary rack. Existing cooling usually cannot keep up once you add a set.
Where most pilots can start - but this cannot be guessed; it must be calculated from the model and real user count.
Typical installation from approval - electrical or new-room work sits at the far end of this range.
Space to reserve depending on workload, together with floor loading and cooling that come with it.
We start not from the machine but from the question "how heavy is your work?" - every other number follows from it
What we build - and what you get back
On-Premise GPU Cluster & AI Compute
Compute clusters designed from your real models and user counts, enterprise-grade hardware, with power and cooling calculated for every option so you compare before deciding.
- 2-3 safe spec options with 3-year cost comparison
- Rack and network cabling layout
- Installation, benchmark testing and delivery with a runbook
Modern Data Center & High-Density Cooling
Assess and upgrade server rooms for high-power GPU racks - covering PDU power, UPS, cooling and building structural load.
- Measured room report: power, heat, weight, with headroom
- Step-by-step upgrade plan within your budget
- Acceptance with standard documents for the facilities team
Hybrid Cloud & High-Performance Network
Connect on-premise to AWS/Azure/GCP with links sized for real big-data volumes - not just "fast internet" - with a fallback plan when the primary link fails.
- Network topology with the bandwidth you actually need
- Connection and throughput testing per plan
- Failover plan and remediation steps for link incidents
From your workload to real racks - step by step
Every project follows the same process: nothing is guessed
How to think about it: from one workload to the racks you pay for
Three common cases - figures are example ranges to demonstrate the method; your real numbers come from the site survey
| Workload | GPUs needed | Power per rack | Heat to remove | Rack space |
|---|---|---|---|---|
| Internal RAG pilot (10-20 users) | 1-2 at 24GB VRAM class | About 2-4 kW | Existing AC can extend | Half a rack |
| Org-wide inference (100-300 users) | 2-4 at 80GB+ class | About 6-12 kW | Airflow replan required | 1-2 racks |
| Continuous fine-tune / training | 4-8+ plus high-speed fabric | About 15-30 kW | Consider special cooling | 2+ racks + extra space |
The common miss: the most expensive number is not the GPU - it is power and cooling over the system’s lifetime. Both are fixed at design time and cannot be retrofitted.
What decision-makers ask before approving budget
What budget does a GPU server start at?
On-premise or cloud?
Can our existing server room take more GPUs?
How long is installation, and who maintains it after?
Before committing budget, let us measure the real room
Engineer site survey, free and without obligation - a report on power, heat and the specs you truly need. Reply within 1 business day.